Sources checked September 26, 2026
China holiday shipping calendar, 2026 to 2027
Quick answer
China's two freight-moving holidays in the next year are National Day Golden Week, 1 to 7 October 2026 (official, with make-up workdays on 20 September and 10 October), and Chinese New Year 2027, which falls on Saturday 6 February 2027 with statutory days 5 to 8 February; the official 2027 schedule is not yet published. To ship before Chinese New Year, SEKO Logistics advises finalising production orders by late November to early December 2026 and booking ocean space 3 to 4 weeks before departure.
This page lists the Chinese public holidays that stop factories and slow freight between now and the end of 2027, each with its official dates, what closes, the lead-time effect a US importer should plan for and a book-by line. Official dates come from the State Council notice on gov.cn. Every operational number names the source it came from, so you can check the line rather than trust us.
As of September 26, 2026
In progress: Mid-Autumn Festival 2026, 25 to 27 Sep 2026 (Fri to Sun), 3 days.
Next: National Day Golden Week 2026 starts Thu, Oct 1, 2026, in 5 days (official). Passed for pre-holiday cargo. Crane's rule is ocean space 3 to 4 weeks before cargo readiness and air at least 1 week ahead, so cargo ready by 30 September needed ocean booked by 2 to 9 September and air by 23 September. Plan on it moving from 8 October onward; 10 October is a working Saturday.
Key facts
| Golden Week 2026 | 1 to 7 October 2026, official. Make-up workdays Sunday 20 September and Saturday 10 October. |
|---|---|
| Chinese New Year 2027 | Lunar New Year's Day is Saturday 6 February 2027. Statutory days 5 to 8 February. |
| 2027 official schedule | Not yet published. The 2026 notice came out on 4 November 2025. |
| Statutory days per year | 13, since the national rules were amended with effect from 1 January 2025. |
| CNY 2027 production order cut-off | 28 November to 12 December 2026 (8 to 10 weeks before, per SEKO). |
| Rows on this calendar | 9: 2 official, 7 expected. |
| Download | CSV ›JSON › |
When are China's public holidays in 2026 and 2027?
Rows marked official are copied from the State Council notice. Rows marked expected show the statutory days on the fixed or lunar date because the 2027 notice is not out yet: the real break is usually longer, and we list no make-up workdays for them rather than guess.
| Holiday | Official dates | Factory impact window | Suggested order or booking deadline |
|---|---|---|---|
| Mid-Autumn Festival 2026中秋节 | 25 to 27 Sep 2026 (Fri to Sun), 3 daysOfficial | 25 to 27 Sep, then a 3-day working gap before Golden Week | Passed. Anything not handed over by 24 September moves in the 28 to 30 September window or after Golden Week. |
| National Day Golden Week 2026国庆节 | 1 to 7 Oct 2026 (Thu to Wed), 7 daysOfficial. Make-up workdays: Sun, Sep 20, 2026, Sat, Oct 10, 2026 | 1 to 7 Oct closed; slower restart after, length not fixed by any source | Passed for pre-holiday cargo. Crane's rule is ocean space 3 to 4 weeks before cargo readiness and air at least 1 week ahead, so cargo ready by 30 September needed ocean booked by 2 to 9 September and air by 23 September. Plan on it moving from 8 October onward; 10 October is a working Saturday. |
| New Year's Day 2027元旦 | 1 Jan 2027 (Fri), statutory 1 dayExpected, official schedule not yet published | 1 Jan; official block not yet published | No separate deadline. Plan it as part of the Chinese New Year 2027 schedule below. |
| Chinese New Year 2027 (Spring Festival)春节 | Lunar New Year's Day is Sat 6 Feb 2027; statutory days 5 to 8 Feb (Eve plus days 1 to 3)Expected, official schedule not yet published | About 9 Jan to mid-March 2027 (SEKO), full stop around 30 Jan to 14 Feb | Finalise production orders 8 to 10 weeks before, which is 28 November to 12 December 2026; rush-order cut-off early to mid January 2027; book ocean space 3 to 4 weeks before departure (4 to 5 weeks at the peak) and ship by mid to late January; book air 1 to 2 weeks before the holiday, in late January. All per SEKO. |
| Qingming Festival 2027清明节 | 5 Apr 2027 (Mon), statutory 1 dayExpected, official schedule not yet published | Official days only; 2027 block not yet published | No sourced lead-time rule. Ask your supplier for its working calendar once the 2027 notice is out and keep ship dates clear of the break. |
| Labor Day 2027劳动节 | 1 to 2 May 2027 (Sat to Sun), statutory 2 daysExpected, official schedule not yet published | Official block, not yet published | No sourced lead-time rule. Once the 2027 block is published, have cargo handed over before its first day. |
| Dragon Boat Festival 2027端午节 | 9 Jun 2027 (Wed), statutory 1 dayExpected, official schedule not yet published | Official days only; 2027 block not yet published | No sourced lead-time rule. Keep ship dates clear of the official block. |
| Mid-Autumn Festival 2027中秋节 | 15 Sep 2027 (Wed), statutory 1 dayExpected, official schedule not yet published | Official days only; 2027 block not yet published | Plan it inside the National Day 2027 schedule: the ocean booking window for pre-holiday cargo opens around the same days. |
| National Day Golden Week 2027国庆节 | 1 to 3 Oct 2027 (Fri to Sun), statutory 3 daysExpected, official schedule not yet published | From 1 Oct 2027; block not yet published | Applying Crane's rule to cargo ready by 30 September 2027: book ocean space by 2 to 9 September 2027 and air by 23 September 2027. Recheck once the official block is out. |
What closes during each holiday, and for how long?
25 to 27 Sep 2026 (Fri to Sun), 3 days · official
Mid-Autumn Festival 2026
3 days off, 25 to 27 September. No make-up workday of its own.
A short break, but in 2026 it sits directly in front of National Day: after it there are only three working days, 28 to 30 September, before the Golden Week block starts. Cargo that missed the pre-Mid-Autumn cut-off competes for those three days with everything else trying to leave before 1 October.
Sources: State Council General Office, notice on the 2026 holiday arrangements (国办发明电〔2025〕7号, 4 Nov 2025)
1 to 7 Oct 2026 (Thu to Wed), 7 days · official
National Day Golden Week 2026
7 days off, 1 to 7 October. Make-up workdays: Sunday 20 September and Saturday 10 October.
Crane Worldwide's advisory: factories, warehouses and government offices may close or run on reduced staff, manufacturing slows significantly, and operations may need additional time to return to normal after the break. September sees a surge of cargo trying to leave first, which constrains capacity and puts upward pressure on rates. On the ocean side, Drewry's tracker of 25 September counts 58 blank sailings across the main East-West trades for weeks 40 to 44 (8% of 712 planned), 64% of them on the Transpacific eastbound. Maersk's own advisory lists Golden Week blankings on its TP8 (from Busan) and TP12 (from Ningbo) Asia to US services, both with a proforma departure of 9 October.
Sources: State Council General Office, notice on the 2026 holiday arrangements (国办发明电〔2025〕7号, 4 Nov 2025)Crane Worldwide Logistics, China Golden Week 2026 shipping advisory (30 Aug 2026)Drewry, Cancelled Sailings Tracker, weekly analysis of 25 Sep 2026Maersk, Transpacific schedule adjustments for Golden Week (28 Aug 2026)
1 Jan 2027 (Fri), statutory 1 day · expected
New Year's Day 2027
Statutory 1 day under the national holiday rules. The 2027 notice, which sets any bridging days, is not yet published.
A one-day statutory holiday. It matters mostly because it falls inside the run-up to the Spring Festival, when SEKO describes factories already reducing capacity from early-to-mid January.
Sources: State Council, decision amending the national holiday rules (in force 1 Jan 2025)GovHK, general holidays for 2027 (used only for the 2027 lunar festival dates)
Lunar New Year's Day is Sat 6 Feb 2027; statutory days 5 to 8 Feb (Eve plus days 1 to 3) · expected
Chinese New Year 2027 (Spring Festival)
Since 2025 the Spring Festival carries 4 statutory days: New Year's Eve and the first three days of the lunar year, which in 2027 are 5 to 8 February. The full 2027 block and its make-up workdays are not yet published. For scale only: the 2026 block ran 9 days, 15 to 23 February.
The longest shutdown of the year. SEKO's guide expects factories to start reducing capacity around 9 to 16 January 2027, a complete shutdown clustered around 30 January to 14 February, a restart at only about 35% of the workforce from roughly 20 February to 6 March, and normal capacity about 4 to 6 weeks after the holiday begins (roughly 6 to 20 March). It adds that up to 25% of factory workers may not return to their previous employer. Ocean rates typically begin climbing in mid-December, with general rate increases announced every 1 to 2 weeks through January, and soften two to three weeks after the holiday if capacity normalises.
Sources: State Council, decision amending the national holiday rules (in force 1 Jan 2025)GovHK, general holidays for 2027 (used only for the 2027 lunar festival dates)State Council General Office, notice on the 2026 holiday arrangements (国办发明电〔2025〕7号, 4 Nov 2025)SEKO Logistics, Lunar New Year 2027 supply chain planning guide (6 Aug 2026)
5 Apr 2027 (Mon), statutory 1 day · expected
Qingming Festival 2027
Statutory 1 day. In 2026 the block was 3 days (4 to 6 April) with no make-up workday. 2027 block not yet published.
A short break. We found no fetched source that quantifies its effect on factory output or freight, so we state none: expect suppliers, trucking and offices to be off for the official days.
Sources: State Council, decision amending the national holiday rules (in force 1 Jan 2025)GovHK, general holidays for 2027 (used only for the 2027 lunar festival dates)State Council General Office, notice on the 2026 holiday arrangements (国办发明电〔2025〕7号, 4 Nov 2025)
1 to 2 May 2027 (Sat to Sun), statutory 2 days · expected
Labor Day 2027
Statutory 2 days since 2025. Both fall on a weekend in 2027, and the rules say a statutory day that falls on a Saturday or Sunday is made up on a working day, so the break will reach into the week; the exact days are not yet published. In 2026 the block was 5 days (1 to 5 May) with a make-up workday on 9 May.
Among the short holidays this is the one that has recently been stretched into a 5-day block. No fetched source quantifies its freight effect; treat the whole official block as closed.
Sources: State Council, decision amending the national holiday rules (in force 1 Jan 2025)State Council General Office, notice on the 2026 holiday arrangements (国办发明电〔2025〕7号, 4 Nov 2025)
9 Jun 2027 (Wed), statutory 1 day · expected
Dragon Boat Festival 2027
Statutory 1 day. In 2026 the block was 3 days (19 to 21 June). 2027 block not yet published.
A short break. No fetched source quantifies its freight effect; expect the official days off.
Sources: State Council, decision amending the national holiday rules (in force 1 Jan 2025)GovHK, general holidays for 2027 (used only for the 2027 lunar festival dates)State Council General Office, notice on the 2026 holiday arrangements (国办发明电〔2025〕7号, 4 Nov 2025)
15 Sep 2027 (Wed), statutory 1 day · expected
Mid-Autumn Festival 2027
Statutory 1 day. Unlike 2026, it falls about two weeks before National Day rather than next to it. 2027 block not yet published.
A short break in the middle of the pre-Golden Week rush. No fetched source quantifies its freight effect on its own.
Sources: State Council, decision amending the national holiday rules (in force 1 Jan 2025)GovHK, general holidays for 2027 (used only for the 2027 lunar festival dates)
1 to 3 Oct 2027 (Fri to Sun), statutory 3 days · expected
National Day Golden Week 2027
Statutory 3 days. Two of them fall on a weekend, so under the rules the break extends into working days; the exact block and make-up workdays are not yet published. For scale only: the 2026 block ran 7 days with two make-up workdays.
Expect the same pattern Crane Worldwide describes for 2026: closures or reduced staffing at factories, warehouses and offices, a September cargo surge with constrained capacity, and a restart that takes additional time.
Sources: State Council, decision amending the national holiday rules (in force 1 Jan 2025)Crane Worldwide Logistics, China Golden Week 2026 shipping advisory (30 Aug 2026)
What is the Chinese New Year 2027 shipping deadline?
Chinese New Year 2027 falls on Saturday 6 February, eleven days earlier than the 2026 festival on 17 February, so the production runway before it is shorter than last year's. The statutory holiday is New Year's Eve plus the first three days of the lunar year, 5 to 8 February, but factories stop well before that and restart well after. The dates below work backwards from 6 February using the lead times in SEKO Logistics' planning guide, which is the most complete current source we read.
- Now to October 2026: get the supplier's CNY calendar. Ask for its last production day and the day it expects to reopen. SEKO suggests confirming production schedules 4 to 5 months ahead, which is September to October 2026.
- 28 November to 12 December 2026: finalise production orders. That is 8 to 10 weeks before the holiday. An order placed after this window is a rush order.
- Mid-December 2026: expect ocean rates to start climbing. SEKO reports general rate increases every one to two weeks through January as shippers rush cargo out.
- Early to mid January 2027: rush-order cut-off. Around the same time (9 to 16 January) factories begin reducing capacity as workers leave for home.
- Mid to late January 2027: last realistic ocean departures. Book the space 3 to 4 weeks before departure, 4 to 5 weeks at the peak, and expect some containers to be rolled to a later vessel even with a booking.
- Late January 2027: last air bookings. SEKO puts air bookings 1 to 2 weeks before the holiday.
- 30 January to mid-March 2027: plan around the gap. A complete shutdown clustered around 30 January to 14 February, a slow restart at about 35% of the workforce, and normal capacity roughly 6 to 20 March.
In practice, for a small seller the question is which stock has to land before the restart. If a product sells steadily through February and March, the order that covers those weeks has to be in production before December is out. Whatever misses that window is safer planned as an April arrival than as a gamble on the last January sailing. Air is the fallback for the gap, not a way to rescue a production order that was placed too late: the goods still have to be made first.
The official 2027 block and its make-up workdays will change which weekdays factories work in late January and February. When the notice is published we will update the Chinese New Year 2027 (Spring Festival) row the same week.
How do Golden Week 2026 shipping delays play out?
Golden Week 2026 is official: 1 to 7 Oct 2026 (Thu to Wed), 7 days, with make-up workdays on Sunday 20 September and Saturday 10 October. In 2026 it follows the Mid-Autumn Festival (25 to 27 September) with only three working days in between, which compresses the pre-holiday rush into a very short window.
- Before the break: Crane Worldwide describes exporters moving cargo before the holiday, a surge in ocean and air volumes through September, constrained capacity and upward pressure on rates.
- During the break: factories, warehouses and government offices may close or run on reduced staff, and cargo processing slows.
- On the water:Drewry's 25 September analysis counts 58 blank sailings across the main East-West trades for weeks 40 to 44, 8% of 712 planned, with 64% of them on the Transpacific eastbound. Maersk's advisory lists Golden Week blankings on two Asia to US services.
- After the break: operations may need additional time to return to normal. No source we read puts a fixed number of days on that, so we do not either.
If your goods are not handed over by 30 September, the realistic plan is a departure from 8 October onward. Ask the supplier whether it works on 10 October, the official make-up Saturday, so you know whether that day counts toward your production time.
How was this calendar built, and what are its limits?
Official dates.The 2026 rows are copied from the State Council General Office notice on the 2026 holiday arrangements, published on gov.cn on 4 November 2025. The statutory days for 2027 come from the national holiday rules as amended in 2024, which since 1 January 2025 give 13 days a year: 1 for New Year, 4 for the Spring Festival (Eve plus days 1 to 3), 1 for Qingming, 2 for Labor Day, 1 each for Dragon Boat and Mid-Autumn, and 3 for National Day. The 2027 lunar dates are cross-checked against the Hong Kong government's gazetted 2027 holiday list, which is a separate jurisdiction and is used only for the calendar dates, never for mainland closure rules.
What we deliberately left out.Make-up workdays for 2027 (they do not exist until the notice is published), any prediction of the length of the 2027 blocks, prices and freight rates, and anything about US customs. Where no fetched source quantified a holiday's effect on freight, as for Qingming, Labor Day and Dragon Boat, the row says so instead of borrowing a number from a blog.
Operational guidance is attributed.Shutdown windows and lead times are the named source's guidance, not a guarantee and not our own measurement. Individual factories set their own last and first working days, and that calendar, from your supplier, beats anything on this page.
Sources read on September 26, 2026:
- State Council General Office, notice on the 2026 holiday arrangements (国办发明电〔2025〕7号, 4 Nov 2025)
- Crane Worldwide Logistics, China Golden Week 2026 shipping advisory (30 Aug 2026)
- Drewry, Cancelled Sailings Tracker, weekly analysis of 25 Sep 2026
- Maersk, Transpacific schedule adjustments for Golden Week (28 Aug 2026)
- State Council, decision amending the national holiday rules (in force 1 Jan 2025)
- GovHK, general holidays for 2027 (used only for the 2027 lunar festival dates)
- SEKO Logistics, Lunar New Year 2027 supply chain planning guide (6 Aug 2026)
How do I cite or reuse this data?
Free to quote with a link back, under CC BY 4.0. The same rows are available as CSV and JSON, with each row's source URLs and the verification date. A suggested sentence:
China's 2026 National Day holiday runs from 1 to 7 October with make-up workdays on 20 September and 10 October, according to the State Council General Office; Chinese New Year 2027 falls on 6 February, and the official 2027 holiday schedule had not been published as of September 26, 2026 (Plain Freight, China holiday shipping calendar).
Canonical URL: https://plainfreight.com/data/china-holiday-shipping-calendar. Spotted a change or an error? Write to hello@plainfreight.com and we will check it against the notice.
What do importers ask about China holidays?
When are the China holidays that affect shipping in 2026 and 2027?
China's two freight-moving holidays in the next year are National Day Golden Week, 1 to 7 October 2026 (official, with make-up workdays on 20 September and 10 October), and Chinese New Year 2027, which falls on Saturday 6 February 2027 with statutory days 5 to 8 February; the official 2027 schedule is not yet published. To ship before Chinese New Year, SEKO Logistics advises finalising production orders by late November to early December 2026 and booking ocean space 3 to 4 weeks before departure.
What is the Chinese New Year 2027 shipping deadline?
There is no single official deadline; it is a chain of cut-offs anchored on Lunar New Year's Day, Saturday 6 February 2027. SEKO Logistics advises finalising production orders 8 to 10 weeks before (28 November to 12 December 2026), a rush-order cut-off in early to mid January, booking ocean space 3 to 4 weeks before departure so cargo sails by mid to late January, and booking air 1 to 2 weeks before the holiday.
How long do Chinese factories close for Chinese New Year 2027?
The statutory holiday is 4 days (5 to 8 February 2027) and the official block, not yet published, is normally longer. SEKO expects a complete shutdown clustered around 30 January to 14 February, a restart at about 35% of the workforce from roughly 20 February, and normal capacity around 6 to 20 March 2027.
Will Golden Week 2026 delay my shipment?
Cargo not handed over before 1 October 2026 waits until the holiday ends on 7 October, and Crane Worldwide notes that operations may need additional time to return to normal afterwards. On the ocean side, Drewry counted 58 blank sailings across the main East-West trades for weeks 40 to 44, 64% of them on the Transpacific eastbound.
Has China published its 2027 holiday schedule?
Not as of September 26, 2026. The State Council General Office published the 2026 schedule on 4 November 2025. Until the 2027 notice appears, this page shows the statutory days on the fixed or lunar date, marked expected, and lists no make-up workdays.
Shipping around a holiday?
Tell us what you are shipping, how heavy and when it is ready, and we will come back with a priced offer that accounts for the break.
Get an instant offerChina shipping times ›Factory to warehouse timeline ›US import rules timeline ›